All
Outcomes
Market
Price
AI Fair
Value
Value
Edge
June 30, 2026
YesNo
September 30, 2026
YesNo
December 31, 2026
YesNo
March 31, 2026
YesNo
AI Insights:
03.12 03:26 UpdatedFair Value Reasoning:
Current date is March 12, 2026. The March option is effectively zero with <3 weeks remaining and no announcements. The market focus has violently shifted to the June (Q2) option, which pumped significantly (~22c to 48.5c) in the last 24h. This price action strongly suggests a leak or rumor regarding a Q2 TGE, overriding the previous fundamental bearishness based on the 'July VC Cliff'. While the market chases June, the September (Q3) option remains fundamentally undervalued; it captures both the aggressive Q2 scenario (cumulative Yes) and the rational Q3 window (post-July unlock). Therefore, September's fair value should carry a significant premium over June, reflecting the combined probability of 'Q2 Rumor + Q3 Fundamentals'.
Sign up to view more information
Exotics
This is a highly niche DeFi sector question. Perena is a stablecoin infrastructure project on Solana. Despite backing from major investors like Binance Labs, it has limited visibility in the broader crypto market. This is a classic 'Alpha' prediction market, primarily appealing to specialists tracking Solana ecosystem airdrops and early-stage projects.
Movers
March 10, 2026 - March 12, 2026, the 'June 30, 2026' option skyrocketed from ~22c to 48.5c (+26.5c), driven by likely insider rumors or signals of a Q2 TGE, completely reversing the previous downtrend based on 'VC vesting constraints'.
March 7, 2026 - March 12, 2026, the 'December 31, 2026' option rebounded from 54.5c to 65.5c (+11c), driven sympathetically by the strength in the June option as overall confidence in a 2026 launch was restored.
Feb 28, 2026 - Mar 1, 2026, a divergence occurred where Dec rose while June fell, reflecting the market's prior defensive rotation into H2.
Divergence
Significant divergence exists. Market Price Action is currently aggressively pricing in a June (Q2) launch, with the price doubling in a short period. However, Fundamental Analysis based on VC cycles suggests projects typically wait until after the 1-year cliff (post-July 2025 funding) to launch, pointing to Q3. The current pump implies the market believes Perena will break convention and launch early, or that the fundamental assumption regarding the vesting schedule has been invalidated by new insider info.